
The new wooden lockers for the Lear Center look very nice!
The exhibit case on the wall leading to the Haines Room with lots of construction material on the floor.
Refinishing the walnut parquet floor in the Palmer Room.

Above an office door waits to be installed. On the right the new door on the office. The plastic tube on the floor takes dust out of the construction site through the outside window.
Working on the ceiling in the corridor outside the Lear Center.
0 comments:
Post a Comment